Skip to content

The Afrisovera Foundation

The Foundation is the human pillar of the whole project. Its flagship is Afrisovera Builders, the training-to-employment pipeline that turns unemployed young people into the certified, permanent, skilled workforce that builds the city. Around it: Talent Kids scholarships and community projects, schools, clinics, clean water, that build alongside the city.

On the city plan

Land comes first. This is where it sits in the planned city, its own surveyed land, kept in its own zone, and what is already designed to stand there.

Educational Campus

30.3 hectares inside the planned city

Primary, secondary and a technical college on green grounds with safe walkways.

Walk through what is planned here

Every building has its own walkthrough, outside and in. Register your interest in any of them; nothing is sold or paid for here.

Afrisovera Technical College: the campus
Afrisovera Technical College: the masonry and block workshopAfrisovera Technical College: the carpentry and roofing workshopAfrisovera Technical College: the drawing and design studioAfrisovera Technical College: the steel and welding workshop

Afrisovera Technical College

THE WORKS YARD. Everything here is taught by doing it, so the college is planned like a works yard rather than a school. Its centre is a BUILDING YARD where full-size house shells stand at every stage, foundations dug, walls half-raised in compressed-earth block, roof trusses going up, put up and taken down again by students each term. The workshop halls stand around it and open straight onto the yard through wide roller doors, so a lesson walks out of the hall and onto the work. Masonry, carpentry and roofing, steel, electrical and solar, plumbing, a materials testing lab and a drawing studio. 2 storeys · 30,000 m² of built floor · a 6 ha site beside the model school. The building is its own teaching aid: built of exactly what it teaches.

Walk through · 15 views
Campus & grounds
Inside a classroomThe Educational Campus: the science labsThe Educational Campus: the assembly hallThe Educational Campus: the dining hall

The Educational Campus

A world-class campus inside the city, green grounds, safe walkways, sunlit classrooms and room to learn and play. The Educational Campus, Cassia Rise. 2 storeys · 50,960 m² of built floor · an 182,000 m² site. Around it: The Hospital 987 m south, The Airport (proposed) 1.1 km north-east.

Walk through · 9 views

Concept visualisations of a proposed city, a riverine site in central Nigeria, exact location to be announced. Subject to design and approvals.

The city plan: the whole landholding, plot by plot

The full landholding, built out in phases. Plots are measured to the Nigerian standard (1 plot ≈ 464 m²) and colour shows the home designed for each one. Phase 1 is the built core; Phase 2 is serviced land with roads in and plots surveyed; Phase 3 is strategic reserve held for later growth. Most of this land is deliberately still empty. That is the expansion plan, not an omission.

available reserved
Land taken0%
View:

Tap any plot for its home, size & price · drag to pan · scroll or use +/− to zoom

This is what a full Afrisovera City is designed to become on land the company secures. Illustrative of what's achievable, not a confirmed or purchased site: no land has been formally acquired yet, and the exact location is intentionally not published ahead of that. Every real structure the company has designed, every one of Afrisovera's live home designs, the airport, rail, industry, the business and innovation districts, the man-made lake and its landmarks, schools, hospital and the rest, sits on this plan, seated along real streets next to its real neighbours. Tap any numbered plot for that home. Serviced land still to be built on is marked plainly.

Loading the whole-city plan

The whole Phase 1 city, zone by zone

The plan above seats every home and building designed so far. Afrisovera City Phase 1 is 3,000 hectares, and most of it is still being designed, so the zones below are shown as zones, not measured plots, until each one is surveyed.

Lakeside PromenadePhase 1 · public waterfront walk & cafés on the man-made lake
Agriculture: Glasshouses & FieldsPhase 1 · vertical farms, aquaponics, agroforestry
Cold-Chain WarehousePhase 1 · 10,000+ ton solar-refrigerated storage
Solar FieldPhase 1 · microgrid + battery storage
Police GatePhase 1 · single secured entry, CCTV
Industrial EstatePhase 1–2 · anchor industries, FTZ-zoned
Residential Blocks A / B / CPhase 2 · the residential neighbourhoods around the core
HospitalPhase 2 · main + neighbourhood clinics
Educational CampusPhase 2 · primary, secondary, technical college
Cultural Plaza · Marketplace · Town HallPhase 2 · civic centre
Mall · CommercialPhase 2 · retail, banks, clinics
Sports ComplexPhase 2 · pool, gym, pitch
Manufacturing R&D + AssemblyPhase 2 · solar kits, EV trikes, 12 core products
LibraryPhase 2 · public, digital, maker space
Wildlife Buffer · ParkPhase 3 · conservation + tourism
Rail StationPhase 3 · inter-city hub, freight spurs to the industrial estate & airport
Nightlife DistrictPhase 3 · 24h essentials, restaurants
Airport (proposed)Concept only · regional/domestic to start, room to extend international. Siting, NCAA/CAA approval, airspace studies precede any design.
Underground network (proposed)Concept only · 3 levels, surface (car-free), −1 (vehicles/freight), −2 (utility spine: water, sewer, power, fibre)

Underground road, drainage and utility levels, and the dug-sand recycling policy that supplies the site's own concrete and mortar sand, are part of the same masterplan and are described in the engineering documentation rather than mapped here plot-by-plot yet.

Afrisovera Builders

From idle to industrial. From unemployment to permanent skilled work. We train. We employ. We house. We promote. A young person joins with nothing and walks a five-stage ladder from their first day of paid training to a skilled career, and the city rises because they build it. It costs around $2,600 to train one youth into a certified builder; leaving that same youth idle can cost the world a hundred thousand dollars a year. The maths is the mission.

T1 · Foundation
3 months, paid from day one, with meals and accommodation, literacy, site safety, tool handling, the trades.
T2 · Specialisation
6 months in a chosen trade, masonry, carpentry, plumbing, electrical & solar, welding, agritech, cold-chain, to City & Guilds (UK) and NBTE certification.
T3 · Employment
A guaranteed job on graduation: starting 20% above minimum wage, free housing for the first two years, healthcare access, family relocation support.
T4 · Advancement
Paid in-service progression: supervisor and foreperson certification, specialist tracks, engineering technician programmes.
T5 · Leadership
Project-management training, degree support for high performers, partner secondments. The leaders who will build city #2.

50,000+ trained directly by 2050 · minimum 30% women in every cohort · priority for local host communities, diaspora returnees, and people with disabilities · first cohorts open as the project reaches that stage.

Start your training: the Builders portal → Trainee sign-in

Want to see where they will learn? Walk through the City School Campus, 1,800 places, run by a vetted operator. Explore the city →

🚀

Talent Kids: Talent Unleashed

Builders raise the city; the Dream Labs raise its imagination. Beyond the trades, the Foundation gives gifted young people the one thing they are almost never given: the environment to create. Labs, studios, workshops, mentors and the freedom to pursue any dream, because if you can dream it, you can build it. Africans are not what the world programmed us to believe. Give these minds the tools and they will land on the moon, invent the technology that changes how the world thinks, and prove a continent’s genius: a breath of fresh air the whole planet feels.

🔬 Innovation & Invention Labs
Robotics, coding, electronics, renewable-energy and biotech benches, where a curious child becomes an inventor with real tools in real hands.
🎨 Creative Studios
Art, music, film, animation, fashion and design, because creativity is a discipline, and African stories deserve world-class craft.
🚀 The Moonshot Programme
Mentorship, seed funding and lab time for the boldest young ideas. The audacious bets that prove nothing here is impossible.
🏆 Talent Scholarships
Full support for gifted children regardless of means. Talent is everywhere; opportunity should be too.

“If you can dream it, you can achieve it.”

Members and partners can also back a Foundation community project with a donation or by volunteering.
Donations and pledges are recorded here and followed up by the Foundation team; actual payments are handled through our payment partners. Every project publishes what it has raised and what it has spent.

Planned separate entity (target: within 90 days of incorporation): The Afrisovera Foundation is currently a programme of AFRISOVERA GLOBAL HOLDINGS LIMITED (Co. No. 17244459). We intend to incorporate it as a separate Community Interest Company (CIC) under the Companies (Audit, Investigations and Community Enterprise) Act 2004. Until incorporated, all Foundation activity is carried out by AGHL. See our Regulatory Status.

Walk through the Foundation 🔊 NARRATED

A narrated cinematic walkthrough of the Foundation's reach, the school courtyard, the scholarship moment, the clinic, the water tap, the graduation. Tap play and unmute to hear the story.

Loading projects